Powering a More Sustainable Washington County: Public EV Charging Comes to Stillwater
Electric vehicles are becoming an increasingly common sight on our local roads, and Washington County is making it easier for residents and visitors to make the switch. Through a growing network of public electric vehicle (EV) charging stations, the county is investing in cleaner transportation and helping reduce emissions throughout the region.
According to a recent Washington County Government update, the county now offers public Level 2 EV charging at 10 locations. Since the first chargers were activated in August 2025, drivers have plugged in more than 1,000 times!
For Stillwater residents and visitors, two particularly convenient locations are the Washington County Government Center and Pine Point Regional Park.

Where to Charge Near Stillwater
A couple of Washington County's charging locations are right here in the Stillwater area, making it easier to charge while visiting county facilities or enjoying the outdoors.
Address: 14949 62nd Street North, Stillwater, MN
Network: ChargePoint
Charging type: Level 2
Public charging available
Located at the Washington County Government Center, these chargers provide a convenient option for residents conducting county business or visiting the area. The site includes multiple charging ports, allowing more than one vehicle to charge at a time.
Address: 11900 Norell Avenue North, Stillwater, MN
Network: ChargePoint
Charging type: Level 2
Public charging available
Planning a visit to Pine Point Regional Park? You can plug in your vehicle while enjoying the park and its outdoor recreation opportunities. It's a convenient way to combine everyday transportation with time spent enjoying our local natural spaces.
Other county charging locations include the Central Service and License Center in Woodbury, Forest Lake Service Center, Cottage Grove Ravine Regional Park, St. Croix Bluffs Regional Park, Lake Elmo Park Reserve, Big Marine Park Reserve, Oakdale Library, and Wildwood Library in Mahtomedi.
What to Know Before You Plug In
Washington County's public charging stations offer Level 2 charging, which is a practical option for drivers who can leave their vehicles plugged in while visiting a destination.
Here are a few helpful details from the county:
Charging cost: $1.00 per session, plus $0.26 per kilowatt-hour.
Charging speed: Level 2 chargers typically add approximately 20–30 miles of driving range per hour.
Vehicle compatibility: Stations use the standard J1772 plug, which is compatible with most electric vehicles. Tesla drivers may need a J1772 adapter.
Charging capacity: Each station can charge two vehicles at a time.
Many stations operate 24/7, although chargers located in county parks may follow park operating hours. Before heading out, drivers can check station availability through the ChargePoint app.

A Growing Commitment to Local Sustainability
Expanding public EV charging is one practical way Washington County is turning its sustainability commitments into measurable progress.
As more residents consider electric vehicles, accessible charging infrastructure can help make electric transportation a more convenient option. Investments like these also complement other county sustainability initiatives, including rooftop solar installations and energy-efficient public facilities.
As Washington County Commissioner Bethany Cox, District 3, shared in the county update:
"Investing in EV charging stations and rooftop solar are two practical steps we can take today to reduce emissions and operate more efficiently."
These improvements demonstrate how local governments can support cleaner transportation while investing in a more sustainable future.
At Sustainable Stillwater MN, we love seeing local initiatives that make sustainable choices more accessible. Whether you're already driving an electric vehicle or simply curious about making the switch, having more charging options close to home is a step in the right direction.
Small changes add up, and a more sustainable future starts right here!
Learn more about Washington County's sustainability initiatives through its 2024–2029 Strategic Plan and Climate Action Plan.
300_edited.png)




Comments